Table 8.2 Event
and Action Plan on Dolphin Movement and Behaviour
EVENT |
ACTION |
|||
ET Leader |
IEC |
SO |
Contractor |
|
Action
Level With the numerical values presented in Table 1, when
any of the response variable for dolphin acoustic behaviour
recorded in the construction phase monitoring is 20% lower or higher than that recorded in the baseline
monitoring, or when there is a shift of 3 hours or more in peak occurrence at B2 Site (i.e. 00:00 –
01:00), the action level should be triggered |
1. Repeat statistical data analysis to
confirm findings; 2. Review all available and relevant data
to ascertain if differences are as a result of natural variation or seasonal
differences; 3. Identify
source(s) of impact; 4. Inform the IEC, SO and Contractor; 5. Check monitoring
data; 6. Carry out audit to ensure all dolphin
protective measures are implemented fully and additional measures be proposed
if necessary |
1. Check monitoring data submitted by ET
and Contractor; 2. Discuss monitoring with the ET and the
Contractor; |
1. Discuss with the IEC the repeat
monitoring and any other measures proposed by the ET; 2. Make agreement on measures to be
implemented. |
1. Inform the SO and confirm notification
of the non- compliance in writing; 2. Discuss with the ET and the IEC and
propose measures to the IEC and the SO; 3. Implement the agreed measures. |
Limit
Level With the numerical values presented in Table 1, when
any of the response variable for dolphin acoustic behaviour
recorded in the construction phase monitoring is 40% lower or higher than that recorded in the baseline
monitoring, or when there is a shift of 6 hours or more in peak occurrence at
B2 Site (i.e. 00:00 – 01:00), the limit level
should be triggered |
1. Repeat statistical data analysis to
confirm findings; 2. Review all available and relevant data
to ascertain if differences are as a result of natural variation or seasonal
differences; 3. Identify
source(s) of impact; 4. Inform the IEC, SO and Contractor; 5. Check monitoring
data; 6. Carry out audit to ensure all dolphin
protective measures are implemented fully and additional measures be proposed
if necessary 7. Discuss additional dolphin monitoring
and any other potential mitigation measures (e.g. consider to temporarily
stop relevant portion of construction activity) with the IEC and Contractor. |
1. Check monitoring data submitted by ET
and Contractor; 2. Discuss monitoring with the ET and the
Contractor; 3. Review proposals for additional
monitoring and any other measures submitted by the Contractor and advise ER
accordingly. |
1. Discuss with the IEC the repeat
monitoring and any other measures proposed by the ET; 2. Make agreement on measures to be
implemented. |
1. Inform the SO and confirm notification
of the non- compliance in writing; 2. Discuss with the ET and the IEC and
propose measures to the IEC and the SO; 3. Implement the agreed measures. |
Abbreviations:
ET – Environmental Team, IEC – Independent Environmental Checker, SO –
Supervising Officer