AUES Job No.: TCS01230/21

 

 

 

 

 

 

 

 

 

Tuen Mun - Chek Lap Kok Link

Contract No. HY/2021/13¡V

Provision of Remaining Compensation Tree Planting for the Tuen Mun ¡V Chek Lap Kok Link Project

 

 

 

 

 

 

 

 

 

 

Final Environmental Monitoring and Audit (EM&A) Report for Establishment Monitoring

 

 

 

 

 

 

 

 

 

 

 

Prepared For

Wing Ho Yuen Landscaping Co., Ltd

 

 

 

 

 

 

 

 

 

 

 

 

 

Date

Reference No.

Prepared By

Certified By

7 February 2025

TCS01230/21/600/R0182v1

My signature

Martin Li

(Environmental Consultant)

Ben Tam

 (Environmental Team Leader)

 

Version

Date

Remarks

1

7 February 2025

First Submission

 

 

 

 

 

 

 

 

 

 


 

 

 

 

EXECUTIVE SUMMARY

ES01       The TM-CLKL had been commissioning at the end of 2020 and the major construction works under the Project had been completed at the end of March 2021.  According to the Project EM&A Manual requirement, establishment monitoring works will be undertaken for a period of two years after the commission of the project

 

ES02       The planting area under TM-CLK Project was constructed by three different Contract - HY/2012/07, HY/2013/12 and HY/2017/10.

 

ES03       According to the requirements of the EIA Report, the TM-CLKL Project shall carry out landscape softworks including planting of 6300 trees within the project limits, amongst others. On completion of the planting works by the three other contracts, 5353 trees were accommodated within the project limits. The Landscape and Visual Plan (LVP) later prepared for this Project recommended the compensatory planting of remaining trees at locations outside the limits of the TM-CLKL Project.

 

ES04       Therefore, the planting works for the outbound area under the Contract No. HY/2021/13 commenced on 21 June 2022 and completed on 15 December 2022. The two years establishment period for those planting area was commenced on 16 December 2022 and completed on 15 December 2024.

 

ES05       This is the Final EM&A report under the Contract No. HY/2021/13 presenting the establishment monitoring results and inspection findings during the establishment period for TM-CLK Project¡¦s out boundary area from 16 December 2022 to 15 December 2024.

 

Summary of EM&A activities for the Reporting Period

ES06       During the establishment period, establishment inspection which supervised by the RLA was conducted quarterly. Total 8 inspections were conducted for the planting area under the Contract.

           

Environmental Complaint

ES07       In the Reporting Period, no environmental complaint was received. The statistical summary of environmental complaints is summarized in the following table.

 

Reporting Period

Environmental Complaint Statistics

Frequency

Cumulative

16 December 2022 to 15 December 2024

0

0

 

Notification of Summons and Successful Prosecutions

ES08       No environmental summons or successful prosecutions were recorded in the Reporting Period.

 

Conclusion

ES09       The condition of the planted tree is satisfaction. Moreover, the species and quantity of tree planted in those areas are complied with the approved Landscape &Visual Plan / Planting Schedule.

 

ES10       The entire establishment monitoring for the planting area under the TMCLKL Project was completed. The quantity of tree planting and the landscape planting area for the TM-CLKL Project fulfil with the EIA Report and EP requirement.

 

 

 

 


Table of Contents

1     Introduction                                                                                                                     1

1.1            Project Background                                                                                       1

1.2            Report Structure                                                                                             1

1.3            Contract Organization                                                                                 2

2     Summary of Monitoring Requirements for the Establishment Period         3

2.1            General                                                                                                                 3

2.2            Environmental Aspects                                                                                  3

3     Summary of Establishment Period Monitoring                                             6

3.1            General                                                                                                                 6

3.2            Landscape and Visual Inspection                                                              6

4     Compliance of Tree planting for TMCLK Project                                        8

4.1            Summary of the tree planting for the Project                                  8

5     Environmental Complaint and Non-compliance                                           9

5.1            Environmental Complaint, Summons and Prosecution                   9

6     Conclusions                                                                                                                     10

6.1            Conclusions                                                                                                      10


 

List of TABLES

Table 2-1      Summary of Establishment Period for the Project

Table 3-1      Details of Provision of Remaining Compensation Tree Planting Works Areas under the Contract

Table 4-1      Summary of Quantity Tree Planting for TM-CLKL Project

Table 4-2      Summary of Landscape Planting Area for TM-CLKL Project

Table 5-1      Statistical Summary of Environmental Complaints

Table 5-2      Statistical Summary of Environmental Summons

Table 5-3      Statistical Summary of Environmental Prosecution

 

 

 

List of Appendices

Appendix A  Project Layout Plan

Appendix B Zoning Plan for the Project

Appendix C  Organization of the Contract

Appendix D Event and Action Plan

Appendix E  Environmental Mitigation and Enhancement Measures Implementation Schedule (EMIS) 

Appendix F  Tree Planting Summary for TMCLK Project

Appendix G Planting Area for the Project

 

 


1                    Introduction

1.1                       Project Background

1.1.1                 According to the findings of the Northwest New Territories (NWNT) Traffic and Infrastructure Review conducted by the Transport Department, Tuen Mun Road, Ting Kau Bridge, Lantau Link and North Lantau Highway would be operating beyond capacity after 2016. This forecast has been based on the estimated increase in cross boundary traffic, developments in the Northwest New Territories (NWNT), and possible developments in North Lantau, including the Airport developments, the Lantau Logistics Park (LLP) and the Hong Kong ¡V Zhuhai ¡V Macao Bridge (HZMB). In order to cope with the anticipated traffic demand, two new road sections between NWNT and North Lantau ¡V Tuen Mun ¡V Chek Lap Kok Link (TM-CLKL) and Tuen Mun Western Bypass (TMWB) are proposed. 

 

1.1.2                 The TM-CLKL had been commissioning at the end of 2020 and the major construction works under the Project had been completed at the end of March 2021.  Due to the Project EM&A Manual requirement, establishment monitoring works had been conducted for a period of two years after the commission of the project.

 

1.1.3                 According to the requirements of the EIA Report, the TM-CLKL Project shall carry out landscape softworks including planting of 6300 trees within the project limits, amongst others. On completion of the planting works by the three other contracts, 5353 trees were accommodated within the project limits. The Landscape and Visual Plan (LVP) later prepared for this Project recommended the compensatory planting of remaining trees at locations outside the limits of the TM-CLKL Project. 

 

1.1.4                 Wing Ho Yuen Landscaping Co., Ltd (hereafter ¡§WHY¡¨) is commissioned by the Highways Department (HyD) as the Main Contractor of the Contract No. HY/2021/13 ¡VProvision of Remaining Compensation Tree Planting for the Tuen Mun ¡V Chek Lap Kok Link Project ((hereafter ¡§the Contract¡¨) and this Contract is part of the Tuen Mun ¡V Chek Lap Kok Link (TM-CLK Link Project).TM-CLK Link Project is a Designated Project under Environmental Permit number EP-354/2009/D issued on 13 March 2015.  The layout Plan and the planting area of the Project are showed in Appendix A and B respectively.

 

1.1.5                 The planting works under the Contract was commenced on 21 June 2022 and completed on 15 December 2022. The entire two years establishment period for those planting area was commenced on 16 December 2022 and completed on 15 December 2024.

 

1.1.6                 The major works during the establishment period mainly include:-

a.              Maintenance the compensation planting area outside the Project¡¦s boundary during the establishment period.

 

1.1.7                 This is the Final EM&A report under the Contract No. HY/2021/13 presenting the establishment monitoring results and inspection findings during the establishment period from 16 December 2022 to 15 December 2024.

 

1.2                       Report Structure

1.2.1                 The Monthly Environmental Monitoring and Audit (EM&A) Report is structured into the following sections:-

Section 1     Introduction

Section 2     Summary of Monitoring Requirements for the Establishment Period

Section 3     Summary of Establishment Period Monitoring

Section 4     Compliance of Tree planting for TMCLK Project

Section 5     Environmental Complaints and Non-Compliance

Section 6     Conclusions

 

1.3                       Contract Organization

1.3.1                 The Contract organization and contact details of key personnel are shown in Appendix C.

 


 

2                    Summary of Monitoring Requirements for the Establishment Period

2.1                       General

2.1.1                 In accordance with the Project EM&A Manual requirements, the environmental aspects under the Project shall be included air quality, ecological, cultural heritage, landscape and visual, landfill gas and site inspection. 

 

2.1.2                 A summary of EM&A requirements under the contract are presented in the sub-sections below. Should non-compliance of the environmental quality criteria occurs, remedial actions will be triggered according to the Event and Action Plan which presented in Appendix D.

 

2.2                       Environmental Aspects

Air

2.2.1                 According to the Contract remaining duty is maintenance the compensation planting area of the Project outside TMCLKL boundary during the establishment period. No specific EM&A requirement for air quality related to the establishment of landscape softworks was identify.

 

2.2.2                 The scopes of works under this Contract do not involve any of works listed under Section 4.4.1.1 of the approved EIA Report. Vehicles travel under this contract was carried out in paved area. Therefore, fugitive dust emission from the contract would be limited and no unacceptable air quality impact would be expected. No specific mitigation measure and monitoring would be required.

 

Noise

2.2.3                 According to the Contract remaining duty is maintenance the compensation planting area of the Project outside TMCLKL boundary during the establishment period. No unacceptable noise impact would be expected from the contract. No mitigation measure would be required under the approved EIA Report. No specific EM&A requirement for noise impact related to the establishment of landscape softworks was identify.

 

2.2.4                 Most of the works under this contract would be conducted manually, with limited use of PME for delivery material on site and watering the planting area along the road side. Therefore, no unacceptable noise impact would be expected. No specific mitigation measure and monitoring would be required.

 

Water Quality

2.2.5                 No marine works will be undertaken under the Contract.  Therefore, no water quality monitoring is required for the construction phase of the Contract..  

 

Ecology

2.2.6                 No marine works will be undertaken under the Contract and generated marine ecological impact, no dolphin monitoring is required for the construction phase of the Contract.

 

2.2.7                 According to the scope of works under the Contract, no identified ecology aspect was related to the Contract, therefore no land base ecology monitoring and mitigation measure would be required.


 

Landscape and Visual

2.2.8                 Monitoring of the planting works during the 24-month Establishment period after completion of the construction works should be carried out. Establishment Works Inspection should be carried out once every 3 months to make sure the establishment planting works is complied with EMIS requirement. The entire compensation tree planting works for this Contract was completed on 15 December 2022. The two years establishment period for those planting area was commenced on 16 December 2022 and completed on 15 December 2024.The summary of Establishment inspection for the TMCLK Project is shown in Table 2-1.

 

Table 2-1    Summary of Establishment inspection for the Project

Contract Area

Establishment Monitoring Commenced

Respond Party

Status of Establishment Monitoring

HY/2012/07

(Zone 1, 3 & 4)

June 2020

HMWSD 2/2020 (HY)

Completed (Last quarter inspection was taken on 26 May 2022)

HY/2012/07

(Zone 2)

June 2020

HY/2021/13

Completed (Last quarter inspection was taken on 25 April 2022)

HY/2013/12

June 2020

HMWSD 2/2020 (HY)

Completed (Last quarter inspection was taken on 31 May 2022)

HY/2017/10

(Zone 1-5)

February 2021

HMWSD 2/2020 (HY)

Completed (Last quarter inspection was taken on 13 Jan 2023)

HY/2017/10

(Zone 6)

February 2021

HY/2021/13

Completed (Last quarter inspection was taken on 13 Jan 2023)

Tuen Mun

(Portion A)

16 December 2022

HY/2021/13

Completed (Last quarter inspection was taken on 9 Dec 2024)

 

Tung Chung

(Portion B)

Penny¡¦s Bay

(Portion C)

 

Cultural Heritage

2.2.9                 According to the works area under the Contract, no cultural heritage zone is located. Therefore, no specific EM&A requirement for construction phase was identified.

 

Landfill Gas

2.2.10             According to work scope of the Contract, there is no works area lies within the 250m Consultation Zone around the closed Pillar Point Valley Landfill. Therefore, no landfill gas monitoring is required for the Contract.

 

Waste Management

2.2.11             According to the Contract remaining duty is maintenance the compensation planting area of the Project outside TMCLKL boundary during the establishment period. No specific EM&A requirement for Waste Management related to the establishment of landscape softworks was identify.

 

2.2.12             All planting area under this contract area are land-based, no dredged sediment, excavated C&D material, C&D waste, chemical waste and sewage would be generated under this Contract. Only limited level of dead plant would be generated from works during maintenance of the planting area and would be easily controlled by standard waste management practice. No specific mitigation measure would be required.

 

Inspection and Audit

2.2.13             According to the Contract remaining duty is maintenance the compensation planting area of the Project outside TMCLKL boundary during the establishment period. No construction works would be taken under this contract. Moreover, no potential environmental issue had been identified in the previous sections. No regular site inspections would be required.

 


 

3                    Summary of Establishment Period Monitoring 

3.1                       General

3.1.1                 According to the Project EM&A Manual requirement, monitoring for the planting works at a frequency of 3 months interval during the 24-month establishment period is required to make sure the establishment planting works is complied with EMIS requirement, and during the 12-month establishment period, the maintenance operations must be supervised by fully qualified Landscape Resident Site Staff (Registered Landscape Architect or Professional Member of the Hong Kong Institute of Landscape Architects).  Subsequent to the 12-month establishment period supervised by the qualified Landscape Resident Site Staff, the supervision from the 13th to the 24th month would be continued by other members of the Project. The EMIS for the Contract is shown in Appendix E.

 

3.2                       Landscape and Visual Inspection

3.2.1                 The planting works under the contract was commenced on 21 June 2022. According to the approved landscape and visual plan, the planting areas under the Contract are summarized in Table 3-1 and the layout plan for the planting zone is illustrated in Appendix B.

 

Table 3-1          Details of Provision of Remaining Compensation Tree Planting Works Areas under the Contract

Works Area

Zone

Location

Proposed Use

Tuen Mun

Portion A1

Zone 1

(Tuen Mun Area)

Slope 6NW-C/F 153

Works area for compensation tree planting

Portion A2

Slope 6SW-A/F 25

Portion A3

Slope 5SE-B/F 89

Slope 5SE-B/F 70

Portion A4

Slope 5SE-D/F 73

Portion A5

Zone 2

(Siu Lam Area)

Slope 6SW-C/FR 200

Portion A6

Slope 6SW-C/F 233

Slope 6SW-D/FR 279

Portion A7

Slope 6SW-D/FR 320

Lantau

Tung Chung

Portion B

Zone 3

(Tung Chung Area)

Slope 9SE-B/F 35

Slope 9SE-B/F 56

Slope 9SE-B/F 74

Works area for compensation tree planting

Penny¡¦s Bay

Portion C

Zone 4

(Penny¡¦s Bay

 Area)

Slope 10NW-D/F 86

Slope 10NW-D/F 88

Slope 10NW-D/FR 89

Slope 10NW-D/FR 90

Slope 10NW-D/F 93

Slope 10NE-C/F 4

Slope 10NE-C/F 5

Slope 10NE-C/F 6

Works area for compensation tree planting

 

3.2.2                 The planting works for the Contract was completed on 15 December 2022. The two years establishment period for those planting area was commenced on 16 December 2022.

 

3.2.3                 In the Reporting Period, total eight establishment period inspections were conducted. The 24-month establishment period for the planting area under this Contract HY/2021/13 was completed at 15 December 2024. The condition of the planted tree is satisfaction. The detail of the establishment inspection checklist can refer to the submitted monthly report under this Contract.

 

3.2.4                 The entire establishment monitoring for the planting area under the TMCLKL Project was completed. The condition of the planted tree is satisfaction. Moreover, the species and quantity of tree planted in those areas are complied with the approved Landscape &Visual Plan / Planting Schedule.

 


 

4                    Compliance of Tree planting for TMCLK Project

4.1                       Summary of the tree planting for the Project

4.1.1                 According to the requirements of the EIA Report and EP, the TM-CLKL Project shall carry out landscape softworks including planting of 6300 trees and provide at least 33 ha of landscape planting. All the planting works for the Project was completed. The compliance check for the quantity of tree planting and landscape planting area for the Project are summarized in Table 4-1 and Table 4-2 the tree planting summary and planting area for TM-CLKL Project is illustrated in Appendix F & G respectively.

 

Table 4-1          Summary of Quantity Tree Planting for TM-CLKL Project

Works Contract

Location

Total No. of Tree Planting  (light standard to heavy standard size)

EIA Requirement

HY/2012/07 (includes Entrusted Landscape Works to DC/2016/01)

Within TMCLK Project Boundary

1247

At least 6300 trees

(light standard to heavy standard size)

HY/2013/12

1109

HY/2017/10

2997

HY/2021/13

Outside TMCLK Project Boundary

1066

 

Total:

6419

Comply

 

Table 4-2          Summary of Landscape Planting Area for TM-CLKL Project

Works Contract

Location

Total Area of Landscape Planting

(ha)

EIA Requirement

HY/2012/07 (includes Entrusted Landscape Works to DC/2016/01)

Within TMCLK Project Boundary

14.3

At least 33 ha

HY/2013/12

5.3

HY/2017/10

14.4

HY/2021/13

Outside TMCLK Project Boundary

NA

 

Total:

33.9

Comply

 

4.1.2                 According to the above summary, the quantity of tree planting and the landscape planting area for the TM-CLKL Project fulfil with the EIA Report and EP requirement.

 


 

5                    Environmental Complaint and Non-compliance

5.1                       Environmental Complaint, Summons and Prosecution

5.1.1                 In the Reporting Period, no environmental complaint, summons and prosecution under the EM&A Programme was lodged. 

 

5.1.2                 The statistical summary table of environmental complaint, summons and prosecution are presented in Tables 5-1, 5-2 and 5-3.

 

Table 5-1      Statistical Summary of Environmental Complaints

Reporting Period

Environmental Complaint Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

Others

16 December 2022 to 15 December 2024

0

0

NA

NA

NA

NA

 

Table 5-2      Statistical Summary of Environmental Summons

Reporting Period

Environmental Summons Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

16 December 2022 to 15 December 2024

0

0

NA

NA

NA

 

Table 5-3      Statistical Summary of Environmental Prosecution

Reporting Period

Environmental Prosecution Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

16 December 2022 to 15 December 2024

0

0

NA

NA

NA

 

5.1.3                 In the Reporting Period, no warning letter related to environmental issue was received from the EPD or HyD.

 

 


 

6                    Conclusions

6.1                       Conclusions

6.1.1                 This is the Final EM&A Report summarized the monitoring results and inspection findings for the establishment monitoring of the Contract HY/2021/13 for the establishment period from 16 December 2022 to 15 December 2024.

 

6.1.2                 During the establishment period, establishment inspection which supervised by the RLA was conducted quarterly. Total 8 inspections were conducted for the planting area under the Contract.

 

6.1.3                 The 24-month establishment period for the planting area under the Contract was completed on 15 December 2024.

 

6.1.4                 The condition of the planted tree is satisfaction. Moreover, the species and quantity of tree planted in those areas are complied with the approved Landscape &Visual Plan / Planting Schedule.

 

6.1.5                 The entire establishment monitoring for the planting area under the TMCLKL Project was completed. The quantity of tree planting and the landscape planting area for the TM-CLKL Project fulfil with the EIA Report and EP requirement.

 

6.1.6                 In the Reporting Period, no environmental complaint was received.

 

6.1.7                 No notifications of summons, or successful prosecution were received during the Reporting Period.

 


 


 

 

 

 

 

 

-End.-