1.1.1
Fugro Technical
Services Limited was commissioned by China Harbour Engineering Co. Limited
(also referred to as ¡§the Contractor¡¨) to undertake the Environmental Team (ET)
services (including environmental monitoring and audit (EM&A)) for Contract
No. HY/2019/01 ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing
Facilities ¡V Phase 2 and Other Works¡¨.
1.1.2
Contract No. HY/2019/01 is part of the ¡§Hong Kong-Zhuhai-Macao
Bridge Hong Kong Boundary Crossing Facilities¡¨ (HZMB HKBCF) Project which is a
¡§Designated Project¡¨ under Schedule 2 of the Environmental Impact Assessment
(EIA) Ordinance (Cap. 499) and for which an EIA Report (Register No.
AEIAR-145/2009) was prepared and approved. The current Environmental Permit
(EP) for HKBCF, namely No. EP-353/2009/K, was issued on 11 April 2016. These
documents are available through the EIA Ordinance Register. The general layout
of the Project area is shown in Figure
1. Commencement of the Contract took place on 4 December 2019 and the
construction site preparation works commenced in early February 2020.
1.1.3
This is the 25th Monthly EM&A report to document the findings
of site inspection activities and EM&A programme carried out by the
Contractor of Contract No. HY/2019/01 from 1 February 2022 to 28 February 2022
(reporting period) and is submitted to fulfil Condition 5.4 of the EP.
1.2.1
The works to be executed under Contract No. HY/2019/01 include the
following major items:
¡P Landscaping and establishment works;
¡P Irrigation system and associated drainage
pumping system and facilities;
¡P Erection and installation in the Passenger
Clearance Building;
¡P Public transport interchange (PTI) public
toilet, satellite refuse collection point (RCP) and observation guard booths;
¡P PTI cross boundary shuttle (CBS) / cross
boundary coach (CBC) lanes and covered walkway;
¡P Vehicle clearance plazas (VCP) vehicle kiosks
and associate automatic vehicle clearance supporting system (AVCSS).
1.3.1
The Project Organization structure is shown in Appendix B. The key
personnel contact names and numbers are summarized in Table 1.1.
1.4
Construction Programme and
Activities
1.4.1
The site layout plan of the Contract is shown in Figure 1.
1.4.2
The construction programme of this Contract is shown in Appendix
A.
1.5.1
The main construction works carried out in the reporting period
were as follow:
¡P
Excavation at VCP (land-based);
¡P
Road & Drain works at SPTI, NPTI and VCP (land-based);
¡P
Covered Walkway at SPTI and NPTI
(land-based);
¡P
Kiosks Construction at VCP
(land-based);
¡P
Landscape Works at G1 and G5
(land-based);
¡P
Conceal Conduits Works at VCP
(land-based);
¡P
E&M Works at SPTI (land-based);
¡P
Irrigation System at G1 and G5
(land-based).
1.6.1
A summary of the relevant permits, licenses and/or notifications
on environmental protection for this Contract is presented in Table 1.2.