1.
INTRODUCTION
1.1
Background
1.1.1
MateriaLab Consultants Limited was commissioned by China Harbour
Engineering Co. Limited (also referred to as ¡§the Contractor¡¨) to undertake the
Environmental Team (ET) services (including environmental monitoring and audit
(EM&A)) for Contract No. HY/2013/03 ¡§Hong Kong-Zhuhai-Macao Bridge Hong
Kong Boundary Crossing Facilities ¡V Vehicle Clearance Plazas and Ancillary
Buildings and Facilities¡¨ (includes the construction works of Contract No.
HY/2013/06 ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing
Facilities ¡V Automatic Vehicle Clearance Support System¡¨ within Contract No.
HY/2013/03 works area) (¡§the Contract¡¨) for the Highways Department of Hong
Kong Special Administrative Region (HKSAR).
1.1.2
Contract
No. HY/2013/03 (includes
the construction works of Contract No. HY/2013/06 within
Contract No. HY/2013/03 works area) is part of Hong
Kong¡VZhuhai¡VMacao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) which
is ¡§Designated Projects¡¨, under Schedule 2 of the Environmental Impact
Assessment Ordinance (EIAO) (Cap 499) and for which an EIA Report (Register No.
AEIAR-145-2009) was prepared and approved. The current Environmental Permit (EP) for HKBCF,
namely No. EP- 353/2009/K, was issued on 11 April 2016. These documents are
available through the EIA Ordinance. The general layout of the Project area is shown in Appendix A.
1.1.3
This is
the twenty-ninth EM&A report to document the findings of site inspection
activities and EM&A programme carried out by the Contractor of Contract No.
HY/2013/03 (includes the
construction works of Contract No. HY/2013/06 within
Contract No. HY/2013/03 works area) from
1 January 2018 to 31 January 2018 (reporting period) under Contract No.
HY/2013/03 (from 1 January 2018 to 31 January 2018 for the construction works of Contract
No. HY/2013/06 within Contract No. HY/2013/03
works area) and is submitted to
fulfil Condition 5.4 of the EP.
1.2
Project Description
1.2.1
The
works to be executed under Contract No. HY/2013/03 include the following major
items:
a.
Cargo clearance facilities including kiosks for
clearance of good vehicles, customs inspection platforms, X-ray building, etc.;
b.
Passenger related facilities including processing
kiosks and examination facilities for private cars and coaches, annexure for
examination of accompanying passengers of private cars, etc.;
c.
Accommodation/offices for the facilities (like fire
station, police station, buildings for Immigration Department [ImmD], Hong Kong Customs and Excise Department [C&ED], Agriculture,
Fisheries and Conservation Department [AFCD], Food and Environmental Hygiene
Department [FEHD],
Department
of Health [DofH] etc.) of the Government departments
providing services in connection with the HKBCF;
d.
Provision of transport and miscellaneous facilities
inside the HKBCF including public transport interchange (PTI), transport
drop-off and pick-up areas, vehicle holding areas, passenger queuing areas,
road networks, footbridges, fencing, sewerage and drainage systems, sewage
treatment plant and treated effluent disposal facilities, water supply system,
building services works, electronic system, and traffic control and information
system including traffic control and surveillance system (TCSS), etc.;
e.
Provision of roads connecting the BCF to the Hong
Kong Link Road (HKLR), the Tuen Mun
¡V Chek Lap Kok Link
(TM-CLKL) and the Hong Kong International Airport (HKIA), expect the part of
road works in HKIA entrusted to the HKLR project; and
f.
Reprovisioning of the
affected HKIA¡¦s facilities, expect those affected by the Automated People Mover
(APM) system such as the existing east rescue berth.
1.2.2
The
works to be executed under Contract No. HY/2013/06 within Contract No.
HY/2013/03 works area include the following major items:
a.
The
Automatic Vehicle Clearance Support System amid to increasing traffic flow for Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities;
b.
Responsible
for designs and develops a set of tailor-made computer monitoring and control
systems to for daily security operation; and
c.
The
Clearance Workstations at 72 vehicle clearance kiosks, Customs and Excise¡¦s
inbound and outbound traffic control centers as well
as a Vehicle Tracking System.
1.3
Project Organisation
1.3.1
The
Project Organisation for Environmental Works of Contract No. HY/2013/03 is
shown in Appendix B. The contact
person and telephone numbers of key personnel for the captioned project are
shown in Table 1.1:
Table
1.1 Contact Persons and Telephone Numbers of Key Personnel (for Contract No.
HY/2013/03)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer
or Engineer¡¦s Representative (AECOM
Asia Co. Ltd.) |
Chief Resident Engineer |
Mr. W. S. Ng |
3958 7400 |
3902
8800 |
Environmental
Project Office / Independent Environmental Checker (Ramboll Hong Kong Limited) |
Environmental
Project Office Leader |
Mr. Y.
H. Hui |
3547
2133 |
3465
2899 |
Independent
Environmental Checker (IEC) |
Mr.
Raymond Dai |
3465
2888 |
3465 2899 |
|
Environmental
Site Supervisor |
Mr.
Ray Yan |
5181
8165 |
3465
2899 |
|
Contractor (China
Harbour Engineering Co. Ltd) |
Site
Agent |
Mr. Paul Pui |
9125 0700 |
2512
0427 |
Environmental
Officer |
Mr. Marko Chan |
9427 2879 |
2512
0427 |
|
Environmental
Team (MateriaLab Consultants Limited) |
Environmental
Team Leader (ETL) |
Mr.
Arthur Cheng |
3565
4115 |
2450
8032 |
24-hr
Complaint Hotline |
-- |
-- |
5236
7111 |
-- |
1.3.2
The
Project Organisation for Environmental Works of Contract No. HY/2013/06 within
Contract No. HY/2013/03 works area is shown in Appendix B. The contact person and telephone numbers of key
personnel for the captioned project are shown in Table 1.2:
Table
1.2 Contact Persons and Telephone Numbers of Key Personnel (for Contract No.
HY/2013/06 within
Contract No. HY/2013/03 works area)
Party |
Position |
Contact Person |
Telephone No. |
Fax No. |
Engineer
or Engineer¡¦s Representative (AECOM
Asia Co. Ltd.) |
Chief Resident Engineer |
Mr. W. S. Ng |
3958 7400 |
3902
8800 |
Environmental
Project Office / Independent Environmental Checker (Ramboll Hong Kong Limited) |
Environmental
Project Office Leader |
Mr. Y.
H. Hui |
3547
2133 |
3465
2899 |
Independent
Environmental Checker (IEC) |
Mr.
Raymond Dai |
3465
2888 |
3465 2899 |
|
Environmental
Site Supervisor |
Mr.
Ray Yan |
5181
8165 |
3465
2899 |
|
Contractor (ATAL
Technologies Limited) |
Site
Agent |
Mr. Eric Yim |
2565 3355 |
3162
5217 |
Environmental
Officer |
Mr. W. Li |
2565 3137 |
3162
5217 |
|
Environmental
Team (MateriaLab Consultants Limited) |
Environmental
Team Leader (ETL) |
Mr.
Arthur Cheng |
3565
4115 |
2450
8032 |
24-hr
Complaint Hotline |
-- |
-- |
6509 0375 |
-- |
1.3.3
The
Contract HY/2013/03 has commenced on 10 April 2015. The commencement of
construction works and the EM&A programme have commenced on 29 August 2015.
1.3.4
The
Contract HY/2013/06 has commenced on 14 August 2015. The commencement of
construction works and the EM&A programme have commenced on 13 September
2016 within Contract No. HY/2013/03 works area.
1.4
Construction Programme
1.4.1
The
construction programme for Contract No. HY/2013/03 (includes the construction
works of HY/2013/06 within Contract No. HY/2013/03 works area) are provided in Appendix C.
1.5
Construction Works Undertaken during the Reporting Period
1.5.1
The construction
works of Contract No. HY/2013/03 commenced on 29 August 2015 (includes the
construction works of Contract No. HY/2013/06 commenced on 13 September 2016
within Contract No. HY/2013/03 works area). During this reporting period, the
following major site activities were commenced:
For Contract No. HY/2013/03
1.
Building at Portion A1, B, G, N, J, STP & Pumping
Stations;
2.
CUE Construction at Portion B, C & J;
3.
Drainage & Sewerage Work, Water Main & Cable
Duct at Portion A1, B, H1, H2, J, P & G;
4.
Fencing work at All site Area;
5.
Sewerage Pumping Station at Portion A1 & G;
6.
Slope Works at Portion K;
7.
Cover Walkway at Portion B, C, J & K;
8.
Box Culvert B at Portion N;
9.
Shuttle kiosk & Subway at Portion E;
10.
Road Work at All site area;
11.
Landscape work at All site area.
For Contract
No. HY/2013/06 within Contract No. HY/2013/03
works area
1.
CUE,
Kiosk & Building 037